POJ 2762--Going from u to v or from v to u?【scc缩点新建图 && 推断是否是弱连通图】
| Time Limit: 2000MS | Memory Limit: 65536K | |
| Total Submissions: 15755 | Accepted: 4172 |
Description
go from x to y, or from y to x. Wind promised that her tasks are all possible, but she actually doesn't know how to decide if a task is possible. To make her life easier, Jiajia decided to choose a cave in which every pair of rooms is a possible task. Given
a cave, can you tell Jiajia whether Wind can randomly choose two rooms without worrying about anything?
Input
The first line for each case contains two integers n, m(0 < n < 1001,m < 6000), the number of rooms and corridors in the cave. The next m lines each contains two integers u and v, indicating that there is a corridor connecting room u and room v directly.
Output
Sample Input
1
3 3
1 2
2 3
3 1
Sample Output
Yes
题意:是给出一些点,给出n个点和m条边,接着给出直接相连的边(注意是有向边),求解随意x,y两点间是否存在 x 可到达 y 或者y可
到达x,假设随意x和y都满足这种条件,就输出"Yes", 否则输出"No".。
注意。这里是 x 到达 y 或者 y 到达 x ,是或者不是并且 。!
。
假设是“并且”的话。非常明显的是推断整个图是否为一个强连通分量(如题HDU 1296 , 题目解析)。但这题并非这样。
本题应推断整个图是否为一个弱连通分量。
正确思路:先求解出该有向图的强连通分量。然后依据求解出来的强连通分量进行缩点又一次建图
问题转换为求解在新图中是否存在一条能走全然部的顶点的路径,这时能够对缩点后的新图进行拓扑排序,看拓扑排序能否够成功进行。
拓扑排序遵循条件
一:新图不能有多于1个的入度为0的点,这是保证每一个点都有边相连。
二:在拓扑排序遍历点u的过程中,若去掉与u相关的边后出现多于1个的入度为0的点,说明这些点仅仅能由u到达,而它们之间不存在可达路径。这时不满足弱连通,跳出。
#include <cstdio>
#include <cstring>
#include <vector>
#include <queue>
#include <algorithm>
#define maxn 10000 + 100
#define maxm 100000 + 1000
using namespace std;
int n, m;
struct node {
int u, v, next;
};
node edge[maxm];
int head[maxn], cnt;
int low[maxn], dfn[maxn];
int dfs_clock;
int Stack[maxn];
bool Instack[maxn];
int top;
int Belong[maxn] , scc_clock;
int in[maxn];
vector<int>Map[maxn]; void init(){
cnt = 0;
memset(head, -1, sizeof(head));
} void addedge(int u, int v){
edge[cnt] = {u, v, head[u]};
head[u] = cnt++;
} void getmap(){
scanf("%d%d", &n, &m);
while(m--){
int a, b;
scanf("%d%d", &a, &b);
addedge(a, b);
}
} void tarjan(int u, int per){
int v;
low[u] = dfn[u] = ++dfs_clock;
Stack[top++] = u;
Instack[u] = true;
for(int i = head[u]; i != -1; i = edge[i].next){
v = edge[i].v;
if(!dfn[v]){
tarjan(v, u);
low[u] = min(low[v], low[u]);
}
else if(Instack[v]){
low[u] = min(low[u], dfn[v]);
}
}
if(dfn[u] == low[u]){
scc_clock++;
do{
v = Stack[--top];
Instack[v] = false;
Belong[v] = scc_clock;
}while(u != v);
}
} void find(){
memset(low, 0, sizeof(low));
memset(dfn, 0, sizeof(dfn));
memset(Instack, false, sizeof(Instack));
memset(Belong, 0, sizeof(Belong));
dfs_clock = scc_clock = top = 0;
for(int i = 1; i <= n; ++i){
if(!dfn[i])
tarjan(i, i);
}
} void suodian(){
for(int i = 1; i <= scc_clock; ++i){
Map[i].clear();
in[i] = 0;
}
for(int i = 0; i < cnt; ++i){
int u = Belong[edge[i].u];
int v = Belong[edge[i].v];
if(u != v){
Map[u].push_back(v);
in[v]++;
}
}
} void solve(){
queue<int>q;
int num = 0;
for(int i = 1; i <= scc_clock; ++i){
if(!in[i]){
num++;
q.push(i);
}
if(num > 1){
printf("No\n");
return ;
}
}
while(!q.empty()){
int u = q.front();
q.pop();
num = 0;
for(int i = 0; i < Map[u].size(); ++i){
int v = Map[u][i];
in[v]--;
if(!in[v]){
num++;
//有两个或两个以上的分支。不是弱连通
if(num > 1){
printf("No\n");
return ;
}
q.push(v);
}
}
}
printf("Yes\n");
} int main (){
int T;
scanf("%d", &T);
while(T--){
init();
getmap();
find();
suodian();
solve();
}
return 0;
}
POJ 2762--Going from u to v or from v to u?【scc缩点新建图 && 推断是否是弱连通图】的更多相关文章
- POJ 3592--Instantaneous Transference【SCC缩点新建图 && SPFA求最长路 && 经典】
Instantaneous Transference Time Limit: 5000MS Memory Limit: 65536K Total Submissions: 6177 Accep ...
- POJ 3126 --Father Christmas flymouse【scc缩点构图 && SPFA求最长路】
Father Christmas flymouse Time Limit: 1000MS Memory Limit: 131072K Total Submissions: 3007 Accep ...
- POJ 2762 Going from u to v or from v to u? (强连通分量缩点+拓扑排序)
题目链接:http://poj.org/problem?id=2762 题意是 有t组样例,n个点m条有向边,取任意两个点u和v,问u能不能到v 或者v能不能到u,要是可以就输出Yes,否则输出No. ...
- poj 2762 Going from u to v or from v to u?(强连通分量+缩点重构图+拓扑排序)
http://poj.org/problem?id=2762 Going from u to v or from v to u? Time Limit: 2000MS Memory Limit: ...
- POJ 2762 Going from u to v or from v to u?(强连通分量+拓扑排序)
职务地址:id=2762">POJ 2762 先缩小点.进而推断网络拓扑结构是否每个号码1(排序我是想不出来这点的. .. ).由于假如有一层为2的话,那么从此之后这两个岔路的点就不可 ...
- POJ 2762 Going from u to v or from v to u? (判断单连通)
http://poj.org/problem?id=2762 题意:给出有向图,判断任意两个点u和v,是否可以从u到v或者从v到u. 思路: 判断图是否是单连通的. 首先来一遍强连通缩点,重新建立新图 ...
- [ tarjan + dfs ] poj 2762 Going from u to v or from v to u?
题目链接: http://poj.org/problem?id=2762 Going from u to v or from v to u? Time Limit: 2000MS Memory L ...
- POJ 2762 Going from u to v or from v to u?(强联通,拓扑排序)
id=2762">http://poj.org/problem?id=2762 Going from u to v or from v to u? Time Limit: 2000MS ...
- [强连通分量] POJ 2762 Going from u to v or from v to u?
Going from u to v or from v to u? Time Limit: 2000MS Memory Limit: 65536K Total Submissions: 17089 ...
随机推荐
- Python 31 TCP协议 、socket套接字
1.TCP协议 可靠传输,TCP数据包没有长度限制,理论上可以无限长,但是为了保证网络的效率,通常TCP数据包的长度不会超过IP数据包的长度,以确保单个TCP数据包不必再分割. (1)三次握手建链接( ...
- LeetCode刷题 1. Two Sum 两数之和 详解 C++语言实现 java语言实现
1. Two Sum 两数之和 Given an array of integers, return indices of the two numbers such that they add up ...
- Win7的虚拟Wi-Fi
前几天无意中发现,Win7的硬件驱动里有个叫Microsoft Virtual WiFi Miniport Adapter的东东,从网上查了一下,可以用来组建临时网络,共享Internet.一块无线网 ...
- Java 自定义线程池
Java 自定义线程池 https://www.cnblogs.com/yaoxiaowen/p/6576898.html public ThreadPoolExecutor(int corePool ...
- C# 多线程系列(一)
线程是怎样工作的 1.多线程由一个线程调度器来进行内部管理,一个功能是CLR常常委托给操做系统. 一个线程调度器确保所有激活的线程在执行期间被合适的分配,等待或者阻塞的线程(比如,一个独占锁或者等待用 ...
- chm文件打开无显示解决办法
右键单击chm文件---属性---在该页面选择“解除锁定”---ok!
- 网页前端状态管理库Redux学习笔记(一)
最近在博客园上看到关于redux的博文,于是去了解了一下. 这个Js库的思路还是很好的,禁止随意修改状态,只能通过触发事件来修改.中文文档在这里. 前面都很顺利,但是看到异步章节,感觉关于异步说得很乱 ...
- Java_Web之状态管理
回顾及作业点评: (1)JSP如何处理客户端的请求? 使用response对象处理响应 (2)请描述转发与重定向有何区别? 转发是在服务器端发挥作用,通过forward方法将提交信息在多个页面间进行传 ...
- XML知识总结
1.XML概念及作用? XML( eXtensible Markup Language,可扩展标记语言)是一种简单的数据存储语言 作用:用来存储和交换数据 无法描述页面的排版和显示形式 2.XML和X ...
- 请不要继续使用VC6.0了!
很多次和身边的同学交流,帮助同学修改代码,互相分享经验,却发现同学们依然在使用老旧的VC6.0作为编程学习的软件,不由得喊出:“请不要继续使用VC6.0了!”. VC6.0作为当年最好的IDE(集成开 ...