Road Construction
Time Limit: 2000MS   Memory Limit: 65536K
Total Submissions: 11210   Accepted: 5572

Description

It's almost summer time, and that means that it's almost summer construction time! This year, the good people who are in charge of the roads on the tropical island paradise of Remote Island would like to repair and upgrade the various roads that lead between the various tourist attractions on the island.

The roads themselves are also rather interesting. Due to the strange customs of the island, the roads are arranged so that they never meet at intersections, but rather pass over or under each other using bridges and tunnels. In this way, each road runs between two specific tourist attractions, so that the tourists do not become irreparably lost.

Unfortunately, given the nature of the repairs and upgrades needed on each road, when the construction company works on a particular road, it is unusable in either direction. This could cause a problem if it becomes impossible to travel between two tourist attractions, even if the construction company works on only one road at any particular time.

So, the Road Department of Remote Island has decided to call upon your consulting services to help remedy this problem. It has been decided that new roads will have to be built between the various attractions in such a way that in the final configuration, if any one road is undergoing construction, it would still be possible to travel between any two tourist attractions using the remaining roads. Your task is to find the minimum number of new roads necessary.

Input

The first line of input will consist of positive integers n and r, separated by a space, where 3 ≤ n ≤ 1000 is the number of tourist attractions on the island, and 2 ≤ r ≤ 1000 is the number of roads. The tourist attractions are conveniently labelled from 1 to n. Each of the following r lines will consist of two integers, v and w, separated by a space, indicating that a road exists between the attractions labelled v and w. Note that you may travel in either direction down each road, and any pair of tourist attractions will have at most one road directly between them. Also, you are assured that in the current configuration, it is possible to travel between any two tourist attractions.

Output

One line, consisting of an integer, which gives the minimum number of roads that we need to add.

Sample Input

10 12
1 2
1 3
1 4
2 5
2 6
5 6
3 7
3 8
7 8
4 9
4 10
9 10 3 3
1 2
2 3
1 3

Sample Output

2
0
【分析】本题就是问最少加多少边使得它成为边双连通图(边连通度>1)。
先用Tarjan模板将各双连通分量缩点,然后ans=(度数为一的缩点数+1)/2。
#include <iostream>
#include <cstring>
#include <cstdio>
#include <algorithm>
#include <cmath>
#include <string>
#include <map>
#include <queue>
#include <vector>
#define inf 0x7fffffff
#define met(a,b) memset(a,b,sizeof a)
typedef long long ll;
using namespace std;
const int N = ;
const int M = ;
int s,t,n,m,cnt,tim,top,cut,k;
int head[M],dfn[M],low[M],stack1[M];
int num[M],in[M],out[M],vis[M],w[N][N];
bool flag=false;
struct man {
int to,nxt;
} edg[M];
void addedg(int u,int v) {
edg[cnt].to=v;
edg[cnt].nxt=head[u];
head[u]=cnt++;
edg[cnt].to=u;
edg[cnt].nxt=head[v];
head[v]=cnt++;
}
void init() {
cnt=;
tim=;
top=cut=k=;
memset(head,-,sizeof head);
memset(dfn,,sizeof dfn);
memset(low,,sizeof low);
memset(stack1,,sizeof stack1);
memset(num,,sizeof num);
memset(in,,sizeof in);
memset(out,,sizeof out);
memset(vis,,sizeof vis);
memset(edg,,sizeof edg);
memset(w,,sizeof w);
}
void Tarjan(int u,int fa) {
int v;
low[u] = dfn[u] = ++tim;
vis[u] = ;
for(int e = head[u]; e != -; e = edg[e].nxt) {
v = edg[e].to;
if(!dfn[v]) {
Tarjan(v,u);
low[u] = min(low[u], low[v]);
} else if(vis[v]&&v!=fa) {
low[u] = min(low[u], dfn[v]);
}
} }
int main() {
int T,u,v;
while(~scanf("%d%d",&n,&m)) {
init();
for(int i=; i<m; i++) {
scanf("%d%d",&u,&v);
addedg(u,v);
}
Tarjan(,);
for(int i=; i<=n; i++) {
for(int j=head[i]; j!=-; j=edg[j].nxt) {
int v=edg[j].to;
if(low[i]!=low[v])out[low[i]]++,out[low[v]]++;
cut=max(cut,low[i]);
//printf("!!!%d %d\n",i,low[i]);
}
}
int son=;
for(int i=; i<=cut; i++) {
if(out[i]==)son++;
}//printf("here\n");
printf("%d\n",(son+)/);
}
return ;
}

POJ3352 Road Construction(边双连通分量)的更多相关文章

  1. POJ 3177 Redundant Paths & POJ 3352 Road Construction(双连通分量)

    Description In order to get from one of the F (1 <= F <= 5,000) grazing fields (which are numb ...

  2. POJ 3352 Road Construction(边双连通分量,桥,tarjan)

    题解转自http://blog.csdn.net/lyy289065406/article/details/6762370   文中部分思路或定义模糊,重写的红色部分为修改过的. 大致题意: 某个企业 ...

  3. POJ 3352 Road Construction (边双连通分量)

    题目链接 题意 :有一个景点要修路,但是有些景点只有一条路可达,若是修路的话则有些景点就到不了,所以要临时搭一些路,以保证无论哪条路在修都能让游客到达任何一个景点 思路 :把景点看成点,路看成边,看要 ...

  4. poj 3352 Road Construction(边双连通分量+缩点)

    题目链接:http://poj.org/problem?id=3352 这题和poj 3177 一样,参考http://www.cnblogs.com/frog112111/p/3367039.htm ...

  5. [POJ3352]Road Construction

    [POJ3352]Road Construction 试题描述 It's almost summer time, and that means that it's almost summer cons ...

  6. POJ3352 Road Construction (双连通分量)

    Road Construction Time Limit:2000MS    Memory Limit:65536KB    64bit IO Format:%I64d & %I64u Sub ...

  7. POJ3352 Road Construction 双连通分量+缩点

    Road Construction Description It's almost summer time, and that means that it's almost summer constr ...

  8. poj3352 Road Construction & poj3177 Redundant Paths (边双连通分量)题解

    题意:有n个点,m条路,问你最少加几条边,让整个图变成边双连通分量. 思路:缩点后变成一颗树,最少加边 = (度为1的点 + 1)/ 2.3177有重边,如果出现重边,用并查集合并两个端点所在的缩点后 ...

  9. POJ-3352 Road Construction,tarjan缩点求边双连通!

    Road Construction 本来不想做这个题,下午总结的时候发现自己花了一周的时间学连通图却连什么是边双连通不清楚,于是百度了一下相关内容,原来就是一个点到另一个至少有两条不同的路. 题意:给 ...

随机推荐

  1. 支持.NET和移动设备的XLS读写控件XLSReadWriteII下载地址及介绍

    原文来自龙博方案网http://www.fanganwang.com/product/3085转载请注明出处 读写任何单元值 数字型.字符型.布尔型以及错误型.但是你了解日期和时间型单元吗?在Exce ...

  2. hashmap和hashtable,arraylist和vector的区别

    hashmap线程不安全,hashtable线程安全 hashmap允许使用 null 值和 null 键.(除了非同步和允许使用 null 之外,HashMap 类与 Hashtable 大致相同. ...

  3. 基于反射的通过set方法的依赖注入,可以看成一种设计模式,自己来用

    非常好用,在properties文件中配置字符串和类名之间的对应,在程序里读取文件,找到类名,通过反射,达到调用set方法的目的,然后直接将自己的指向其他类的对象的引用赋值,指向实体对象. 比如use ...

  4. 安装xampp后,遇到的各种问题

    一.apache无法启动 1.查看端口是否被占用 80端口冲突,解决方法:打开目录C:\xampp\apache\conf(我的安装目录为C:\xampp)下的httpd.conf文件,将Listen ...

  5. 《java作业》

    /* 2.编写一个类,该类有一个方法public int f(int a,int b), 该方法返回a和b的最大公约数.然后再编写一个该类的子类, 要求子类重写方法f,而且重写的方法将返回a和b的最小 ...

  6. Java基础毕向东day04

    1. 数组 2.选择排序.冒泡排序.折半查找.

  7. 毕向东day01笔记--dos-jdk-jre-环境变量等

    1.常用的dos命令,md,rd,dir,c:(进入C盘),del,set classpath 2.JDK和JRE之间的区别: JDK包含JER,JRE包含JVM. 3.环境变量的配置,静态配置--b ...

  8. sqlserver定时备份

    前言:给客户部署好系统以后,如果不加一个定时备份,总感觉心里不放心,所以一定要做定时备份,并且定时备份是很简单的 新建作业--基本信息 新建步骤 ) ),) print @filename , NOF ...

  9. 关于resolve非泛型方法不能与类型实参一起使用

    今天mvc新建三层时,写到bll层中一直报下面的错误,检查了几遍赶脚并没有什么错.最后发现缺少一些引用. 如下面的图,少添加了下面的两个引用.Unity是微软模式与实践团队开发的一个轻量级.可扩展的依 ...

  10. os.system和os.popen

    使用os.popen调用test.sh的情况: python调用Shell脚本,有两种方法:os.system(cmd)或os.popen(cmd),前者返回值是脚本的退出状态码,后者的返回值是脚本执 ...