hdu 3572 Task Schedule 网络流】的更多相关文章

题目链接:http://acm.hdu.edu.cn/showproblem.php?pid=3572 Our geometry princess XMM has stoped her study in computational geometry to concentrate on her newly opened factory. Her factory has introduced M new machines in order to process the coming N tasks.…
pid=3572">Task Schedule Time Limit: 2000/1000 MS (Java/Others)    Memory Limit: 65536/32768 K (Java/Others) Total Submission(s): 3412    Accepted Submission(s): 1197 Problem Description Our geometry princess XMM has stoped her study in computation…
Task Schedule Time Limit: 2000/1000 MS (Java/Others)    Memory Limit: 65536/32768 K (Java/Others) Total Submission(s): 7753    Accepted Submission(s): 2381 Problem Description Our geometry princess XMM has stoped her study in computational geometry t…
C - Task Schedule Time Limit:1000MS     Memory Limit:32768KB     64bit IO Format:%I64d & %I64u Submit Status Practice HDU 3572   Description Our geometry princess XMM has stoped her study in computational geometry to concentrate on her newly opened f…
Task Schedule 题意:有N个任务,M台机器.每一个任务给S,P,E分别表示该任务的(最早开始)开始时间,持续时间和(最晚)结束时间:问每一个任务是否能在预定的时间区间内完成: 注:每一个任务一个时间只能由一台机器加工,(意味着可以随意离散加工的时间点,只要所用的时间点之和为P即可;将天数变成点建图)每一台机器一个时间点也只能加工一个任务: 重点是构图:如果将任务抽象成一个点,所需的时间P变成从该点流出的流量(从源点流入边的容量~~)那么只需按照输入顺序标记为点号与源点s连边,边的容量…
Task Schedule Time Limit: 2000/1000 MS (Java/Others)    Memory Limit: 65536/32768 K (Java/Others) Total Submission(s): 5550    Accepted Submission(s): 1786 Problem Description Our geometry princess XMM has stoped her study in computational geometry t…
Problem Description Our geometry princess XMM has stoped her study in computational geometry to concentrate on her newly opened factory. Her factory has introduced M new machines in order to process the coming N tasks. For the i-th task, the factory…
题目链接 题意: 有M个机器,N个任务 对第i个任务,需要在[Si,Ei]这段时间内恰有Pi天被process 每天最多有M个机器同时工作 每一天,一个任务若被process,那么它恰占用一个机器. 题解:建图,设一个超级源点S编号为0,超级汇点T编号为1001,编号[1,500]表示任务[1,500],编号[501,100]表示时间[1,500] (为与原题对应,建边时用500作为偏移量). 每一天最多同时加工M个任务,故每一天向超级汇点连一条容量为M的边 以满足此不等关系. 每个任务最多需要…
题目链接:http://acm.hdu.edu.cn/showproblem.php? pid=3572 题意:m台机器.须要做n个任务. 第i个任务.你须要使用机器Pi天,且这个任务要在[Si  ,  Ei]区间内完毕才有效. 对于一个任务,仅仅能由一个机器来完毕.一个机器同一时间仅仅能做一个任务. 当然,一个任务能够分成几段不连续的时间来完毕.问,是否能做完所有任务. 题意非常清晰.也就是推断是否是满流. 对于网络流问题,模板大家都有,关键在于怎样建图(详见资料) 思路:今天问了龙哥,对建图…
Problem Description Our geometry princess XMM has stoped her study in computational geometry to concentrate on her newly opened factory. Her factory has introduced M new machines in order to process the coming N tasks. For the i-th task, the factory…