codeforce 853A Planning】的更多相关文章

题目地址:http://codeforces.com/problemset/problem/853/A 题目大意: 本来安排了 n 架飞机,每架飞机有 ci 的重要度, 第 i 架飞机的起飞时间为 i ,而现在,在 k 时之前不能有任何飞机起飞,每个时间点只有1架飞机能起飞, 损失=(飞机现起飞时间-飞机原起飞时间)*该飞机的重要度. 现在要求你排一张时间表,要求每架飞机都只能在原起飞时间及以后起飞,且使损失最小. 题解: 贪心 暴力的数组模拟tle,o(≧口≦)o #include<bits/…
Helen works in Metropolis airport. She is responsible for creating a departure schedule. There are n flights that must depart today, the i-th of them is planned to depart at the i-th minute of the day. Metropolis airport is the main transport hub of…
题意 给出飞机单位晚点时间代价和原定起飞时间,现在前k分钟不能起飞,求付出的最小代价和起飞顺序 思路 构造两个优先队列q1,q2,q1按时间顺序,q2按代价顺序,初始将所有飞机入q1,将时间在k前的飞机从q1加入q2,然后按时间顺序取出q1加入q2,同时从q2取出代价最大的加入答案 代码 #include<bits/stdc++.h> using namespace std; inline int read(){ ,f= ; char ch = getchar(); ;ch = getchar…
Helen works in Metropolis airport. She is responsible for creating a departure schedule. There are n flights that must depart today, the i-th of them is planned to depart at the i-th minute of the day. Metropolis airport is the main transport hub of…
我: Tech Leader 团队:团队成员分布在两个城市,我所在的城市包括我有4个成员,另外一个城市包括SM有7个成员.另外由于我们的BA离职了,我暂代IT 的PO 职位.PM和我在一个城市,但他不参于敏捷的运作里面. 迭代: 双周 主要会议: Grooming, Sprint Planning, Daily Standup Meeting, Sprint Review Meeting, Retrospective Meeting. 现在有名外部敏捷教练在带着我们实施敏捷,不过从sprint3…
This is a sample agenda for a sprint planning meeting. Depending on your context you will have to change the details, just make sure the outcomes stay the same. Meeting purpose: Plan and prepare for the upcoming sprintMeeting duration: ca. 1 hour for…
原文链接:http://domaintree.me/?p=1037 By Robert Thibodeau –  Starting a business can be a very daunting adventure if a proper plan is not put in place. Most entrepreneurs start up their businesses without putting adequate plans in place to succeed. No wo…
Employment Planning Time Limit: 2000/1000 MS (Java/Others) Memory Limit: 65536/32768 K (Java/Others)Total Submission(s): 5292 Accepted Submission(s): 2262 Problem DescriptionA project manager wants to determine the number of the workers needed in eve…
recourse: "Software Engineering", Ian Sommerville Keywords for this chapter: planning scheduling cost estimation Project planning takes place at three stages in a project life cycle: At the proposal stage (When you are bidding for a contract to…
原创博文:转载请标明出处:http://www.cnblogs.com/zxouxuewei 最近有不少人询问有关MoveIt!与OMPL相关的话题,但是大部分问题都集中于XXX功能怎么实现,XXX错误怎么解决.表面上看,解决这些问题的方法就是提供正确的代码,正确的编译方法,正确的运行步骤. 然而,这种解决方法只能解决这个特定的问题,而且解决之后我们也无法学到一些实际的东西.要想彻底明白,需要从源头入手,也就是说,不要问"MoveIt! 怎么把机械手从空间一个点移到另一个点?",而是要…